Forums - Open Redstone Engineers

Full Version: School Migration
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Hello,

The time has come and I am retiring nickstar from service (more like ripstar amirite). After serving me for 6 years and ORE for 3, it is about time.

Around 2PM UTC January 20th, the School server will be going offline. During this time, the new host will be configured and should be fully functional within an hour.

New host won't have such a wretched name, I promise.

Cheers,
~Nickster258
YESSSS... UPTIME IS OVER, DIE NICKSTAR DIE!!!!
It lasted 670 days. Poor server.
(01-19-2018, 04:54 PM)Nickster258 Wrote: [ -> ]Hello,

The time has come and I am retiring nickstar from service (more like ripstar amirite). After serving me for 6 years and ORE for 3, it is about time.

Around 2PM UTC January 20th, the School server will be going offline. During this time, the new host will be configured and should be fully functional within an hour.

New host won't have such a wretched name, I promise.

Cheers,
~Nickster258

FINALLY.
The server has been migrated and is now running smoothly.

It does not have as much RAM dedicated to it as I would like, simply because School's new host also hosts other things. Eventually that will no longer be an issue once I take the proceeds from Nickstar and invest it into another machine, then there would be much more RAM to through around.

That being said, TPS has remained a very competent 20.0 and it should stay like that, definitely considering the new host has a CPU designed in 2017 instead of a CPU from 2010.

Either way, happy playing!